Generic filters

Company & Industry

News

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

WHY THE LOWEST O&M BUDGET IS RARELY THE MOST PROFITABLE By: Robert Wolfe, Director of Asset Optimization, NAES Executive Summary. O&M budgets should be evaluated by the operating margin they enable, not by cost adherence alone. The optimal investment level...

Categories

Tags

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

WHY THE LOWEST O&M BUDGET IS RARELY THE MOST PROFITABLE By: Robert Wolfe, Director of Asset Optimization, NAES Executive Summary. O&M budgets should be evaluated by the operating margin they enable, not by cost adherence...

Powering Mexico Through People, Safety, and Excellence

How a culture of collaboration, accountability, and safety is driving operational excellence across NAES Mexico. By: Lydia Sauer, Communications Associate Reliable power doesn’t happen by chance. Behind every megawatt is a team of professionals committed...

Green Hydrogen as Long-Duration Energy Storage 

The Problem Renewables Haven’t Solved  Solar and wind now produce some of the cheapest electricity ever built — strictly on their own schedule. The grid’s problem isn’t clean energy; it’s dispatchable clean energy — power that arrives when it’s needed. Batteries bridge hours: most...

CISA’s AI Guidance to Power Plants

By Leonard Wills, NERC Reliability Specialist The power industry continues to deploy AI technologies to analyze operational data, identify equipment anomalies, improve predictive maintenance, and help operators make faster decisions. These capabilities offer operational benefits,...

NERC Based Pre-Job Briefs

By Chuck Holm, NERC Reliabilty Specialist Pre-Job briefs are typically completed to ensure that the job scope is properly identified and that the safety aspects of the job are clearly identified and mitigated. Over time,...