FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

WHY THE LOWEST O&M BUDGET IS RARELY THE MOST PROFITABLE By: Robert Wolfe, Director of Asset Optimization, NAES Executive Summary. O&M budgets should be evaluated by the operating margin they enable, not by cost adherence alone. The optimal investment level...

Categories

Tags

Minnesota River Station

49 MW dual-fuel natural gas and oil plant that consists of an electric generation plant and a distribution substation located in Chaska, Minnesota. The facility sits on seven acres approximately 500 feet from the Minnesota River....

Shady Point

NAES Environmental serviced a 320 MW coal-fired cogeneration plant in the mid-west, which utilizes four coal-fired circulation fluidized bed (CFB) boilers and two steam turbines and their respective generators. The facility controls NOx and SO2 emissions with...

Embracing Security: Navigating CIP-003-9 Implementation

By Sean Thompson, NERC Supervisor The digital age has intensified the need for robust cybersecurity measures across all sectors, particularly within the Bulk Electric System (BES). The North American Electric Reliability Corporation (NERC) has responded...

2023 Long Term Risk Assessment (LTRA)

By Allegra Jones, NERC Reliability Specialist In December, NERC released their 2023 Long Term Risk Assessment (LTRA). The LTRA is the ERO’s self-assessment of the Bulk Power System’s (BPS) ability to meet demand over the next 10...

The Operator’s Role in NERC Compliance

By Chuck Holm, NERC Reliability Specialist The front-line employee is a key NERC Standard Compliance resource. The front-line employee will have eyes and ears on the regulatory functions of the facility and will keep the...

Cyber Attacks Are Everywhere!

By Trysten Schlottmann, NERC Operations Analyst It comes as no surprise these days that there seems to be breaking news in the realm of Cyber Security nearly every day from great leaps in technologies to...