Generic filters

Company & Industry

News

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

WHY THE LOWEST O&M BUDGET IS RARELY THE MOST PROFITABLE By: Robert Wolfe, Director of Asset Optimization, NAES Executive Summary. O&M budgets should be evaluated by the operating margin they enable, not by cost adherence alone. The optimal investment level...

Categories

Tags

NERC 2024 State of Reliability (SOR) Report 

By Carl Curry, NERC Reliability Specialist  NERC released the 2024 State of Reliability (SOR) report and SOR Overview in June, 2024, which provides an assessment of the Bulk Power System (BPS) based on performance of...

DCI & ACI Systems Installations

NAES Power Contractors (NPC) installed a new Dry Sorbent Injection (DSI) system and an Activated Carbon Injection (ACI) system at a major coal-fired generating station owned by a cooperative in the Midwest as part of...

Air Preheater Rebuild

NAES Power Contractors (NPC) rebuilt an Alstom air preheater at an 850 MW coal-fired plant. NPC worked around the clock for three weeks to expedite the unit’s return to service. The team built temporary shelters...

Conemaugh ESP Rebuild

NAES Power Contractors (NPC) had responsibility for site management, craft labor and directing subcontractors for this $31 million-plus project at the 1,800 MW Conemaugh Generating Station. NPC s upplied and installed new electrostatic precipitator (ESP)...

Colstrip Power Plant

NAES Power Contractors has provided ongoing maintenance, modification and construction at the 2,218 MW Colstrip facility since 1988, including services during normal operating periods, scheduled outages and unscheduled outages. NPC provided the same services at...

AMP – Fremont Energy Center

AMP Fremont is a 540 MW nominal load 2 x 1 natural gas fired generating station with 163 MW of duct-firing capacity. American Municipal Power (AMP) and its members self-operate several electric plants. However, for...

Elwood Energy

The largest simple cycle plant in the US, Elwood consists of 9 GE Frame 7FA combustion turbines. The facility is a full merchant power as of Spring 2017 with 15 full-time employees covering 24/7. Elwood,...

Mid-Connecticut

Connecticut’s Materials Innovation and Recycling Authority (MIRA) facility presents a triple challenge to an operator, in that its three discrete units – a Waste Processing Facility (WPF), a Power Block Facility (PBF) and an auxiliary...