Generic filters

Company & Industry

News

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

FINDING THE ECONOMIC OPTIMUM IN POWER PLANT O&M

WHY THE LOWEST O&M BUDGET IS RARELY THE MOST PROFITABLE By: Robert Wolfe, Director of Asset Optimization, NAES Executive Summary. O&M budgets should be evaluated by the operating margin they enable, not by cost adherence alone. The optimal investment level...

Categories

Tags

Wholesale Energy Market Expectations (WEM)

Mexico, despite being one of the largest economies in Latin America, does not stand out for its great sporting achievements, development, or educational system. Instead, Mexico does stand out for negative issues such as violence...

Tuxpan II and V Combined Cycle Power Stations

NAES-MEXICO operates and maintains the Tuxpan II and V combined cycle power plants, which generate 990 MW of electricity with CFE (Electricity Federal Commission) as a client; currently both plants have a comprehensive management system...

CORES, Align and the Expansion of the ERO Portal

By Jack Jackson, Sr NERC Reliability Specialist Over the past several years, NERC has been working with the regions to centralize several processes through the NERC ERO Portal. Most familiar to Generator Operators would be...

NERC Spy: Insider’s Guide to VAR-002 for Generators

By Michael Tate, NERC Reliability Specialist VAR-002, a standard with roots back to the 2003 blackout, is a trending audit item for Generator Operators. Some generators are constrained by a narrow voltage schedule issued by...